case_study

Case study: 22% throughput gain at a Midwest bun plant

Marcus Cole · 7/19/2026 · 8 min read

How a divider and proofer upgrade unlocked a full extra shift of capacity.

A Midwest bun producer was running three shifts and still short on capacity. Rather than build, they rebalanced the line.\n\nReplacing the legacy divider with a Halbrook SD-8 removed the scaling give-away that had forced a 4% overweight target. Adding a Meridian Bake IP-40 intermediate proofer allowed dough to relax properly before moulding, cutting rework at the panner.\n\nCombined, the plant recorded a 22% throughput gain with no increase in floor space.

Tell us what you need to run.

Send throughput targets, product mix and floor constraints. An application engineer replies within one business day.